We Have Power! And Some Plumbing Too!
The electrician and plumber started their work today and made great progress in just one day’s time! Wow! We still need the drilled well installed. That will be done within the next couple of weeks! Can’t wait to have water and power! Awesome!
The panel on the left is for the generator and includes the transfer switch. The panel on the left is the main panel. Our very first outlet has been installed! Our contractor and crew are thrilled to have this now! Prior to this they had to use a portable generator for power.