We Have Power! And Some Plumbing Too!

The electrician and plumber started their work today and made great progress in just one day’s time! Wow! We still need the drilled well installed. That will be done within the next couple of weeks! Can’t wait to have water and power! Awesome! 

The panel on the left is for the generator and includes the transfer switch. The panel on the left is the main panel. Our very first outlet has been installed! Our contractor and crew are thrilled to have this now! Prior to this they had to use a portable generator for power. 


Our very first outlet! 




Wires coming from parts of the house will be installed into the main fuse box. One side of the house has been wired! 


Wire being run throughout the house!


Water lines have also been started today! 


And drainage piping has also been started! 



More wiring! 



Wires have been pulled into the outlet and switch openings! 






Drain pipes in progress in the first floor bathroom, including the toilet!


More wiring on the first floor! 










Wiring in the ceiling of the bedroom closets. I know we will have closet lights when done! 




Pipes in the second floor bedroom! 



Comments

Popular posts from this blog

Catching Up: Wildlife

Latest Photos!

Weekend Visit!