Latest Updates!
The insulation and pine tongue and groove wall boards are being installed in the open section of the basement and we have ordered the toilet and utility/laundry sink for our half bath/laundry room in the basement. The propane monitor is now running in in the basement during the day when workers are there but they turn it off when they leave since the entire house is not yet insulated. We would blow through a lot of propane at this point if the monitor heater was left running 24/7. The gas lines were run from the propane tank to the heater by the gas company two days ago! Prior to this, our contractor was using a portable propane heater with portable propane tank in the basement to stay warm while insulating the basement and putting up the pine tongue and groove wall boards down there. Before the pine wall boards can be installed they have to be treated first with some kind of lacquer. But the temperature has to be warm enough to treat the pine boards with lacquer. So they need to heat ...