Our stand by generator was delivered today! The electrician will be working on the fuse main panel for the house by the end of the week and will now be able to incorporate the additional fuse panel and transfer switch into the project! The power company came last week and complete the wiring from the new telephone pole across the street to our telephone pole out front, then underground from there to the house, and hooked up to the meter in the meter box. On Saturday, five days after our lines were finally installed, two of our hemlock trees fell into the road and knocked down our power line going from the main telephone pole across the street to our pole plus the main power lines! Plus there was a fire caused by the electrical lines breaking. The fire department and power company quickly responded. The power was shut off by the power company and then they were able to remove the two trees and the lines, and power was restored. We have had very windy conditions the last few days!
Well, here it is! Yay!!!
This is the pad that the generator will be set on. The battery back is also here, on the right.
Battery pack for the generator.
Fuse box with transfer switch inside this box, placed where the main fuse panel will be mounted to the wall in the basement.
The wind has continued to be severe since Saturday, the past three days, and more hemlock trees have fallen on our property! Fortunately none of the others have impacted the electrical lines or the house!
These hemlocks are now blocking the trail that Hubby cleared.
This hemlock is on the other side of the house, and it got caught up in other trees. If this one lets go and finally falls, it may reach the street but won’t impact any power lines, thankfully!
Some additional photos of the house today! I suspect all of the windows will be installed within the next couple of days!
The upper window openings are actively being prepped for window installation!
One of the upper windows is out of the box and ready to go!
Another upper window is out of the box and ready to be installed!
All three windows on this side of the house, first floor, have been installed!
One widow on the other side of the house, first floor, has been installed.
Two out of three windows, master bathroom and bedroom, have been installed on the second floor loft area!
Two out of three windows, master bathroom and bedroom, have been installed on the second floor loft area.
One more window left to install in the master bedroom.
Sitting on the edge of the loft and enjoying the view!
Farmers porch in progress!
Crew working on roof and roof trim work!
View from basement window! My dog outside!
Another standard window, ready to go for installation!
Door for our main entrance!
Double doors for our basement walkout!
The box on the right is the slider door for the entrance to the main deck from the living and kitchen area!
Basement!
I suspect this is the window for the large window in the basement!
Still enjoying our visit to New Hampshire this week, staying at my son and his wife’s home! Hubby and I have the week off from work!