Septic is Done!!!!!

The septic system has been installed and approved by the state. Once approved by the state, the tank and leach field were covered over! So exciting! Next steps: foundation footings, completion of drainage pipes around the base of the foundation, and then the foundation and floor! Half of the foundation concrete walls will be eight feet high, the other half will be four feet high. On the lower section will be logs that will build up to the first floor of our house where a double door walk out plus a window will be incorporated, facing the mountain view. The eight-foot concrete wall facing the road will have two small foundation windows as well. Once the log walls are built up to the first floor of the house, the foundation will be capped and building the actual log cabin house will commence! 




Some of the drainage pipes to keep the basement dry have been installed. 





Comments

  1. Amazing! It's moving right along! Congratulations!!! : )

    ReplyDelete
  2. Yes!! So exciting! Now all we need is a toilet! LOL!!

    ReplyDelete

Post a Comment

Popular posts from this blog

Catching Up: Wildlife

Latest Photos!

Weekend Visit!