We went up to New Hampshire this weekend and brought all of our light fixtures there for when the electrician is ready to install them all: Ceiling fan for great room (living room/kitchen): Great room: Ceiling fan for master bedroom second floor: Master bedroom: Light for over the kitchen island: Light for over the kitchen sink: Our kitchen design: Kitchen location: Will be on the right side of the great room! Looking out from the kitchen area: Kitchen will be on the other side of this framing: The kitchen cabinets and countertops have been ordered and will be delivered in 1-2 weeks! We need to order our gas stove, range top microwave, refrigerator and dishwasher within the next few days! Our contractor said the dishwasher isn’t as important as it can be installed any time, but I would rather order all of it now. Exterior lights; 2 for the farmer’s porch and 2 for the deck: Boxes with lights inside of them sta...